Five Year System Planning Studies *More*

This type of study includes all category B and C contingencies for summer and winter, peak and off peak conditions. It also can include changes in power factor, loading pattern and level, and transfer pattern and level. Voltage limit violations are determined for each contingency evaluated and an integrated thermal and voltage security assessment is provided. System Planning and Design changes must be proposed for each area and loadpocket problem. Intellicon estimates this study will take three to six months to complete. *More*

Yearly Voltage Stability Assessment Studies *More*

All single and double contingencies for all major load pockets for the worst peak load condition. It also can include changes in power factor and level, loading pattern and level, and transfer pattern and level. Voltage limit violations are determined for each contingency evaluated and an integrated thermal and voltage security assessment is provided. Intellicon estimates this study will take one month to complete. Current methods can cost upwards of $2,000,000, take several months for a large ISO, and result in an incomplete assessment. *More*

Operation Planning Voltage Stability Security Assessment (Quarterly, Monthly, Weekly) *More*

The Batch Contingency Simulation and the Comprehensive P-V Assessment and Comprehensive V-Q Assessment will be computed for the ISO, Transmission Operator or Utility. Thermal and voltage security assessment is also provided. *More*